1. A good day today. Getting use to only having five guys on a dive site now. Today we had to assemble quick erect scaffolding in 18m low visability water. All the equipment was handed down piece by piece on messenger lines. The feet, uprights and cross beams all came down separately. With two divers in the water the tasks went well, we are getting things organised on surface before descending, we have no comms between divers only to the supervisor on top, relaying messages is impossible so everything must be arranged top side. The team is getting on really well which helps when it comes to getting setup in the morning and de-rigging in the evening. Let’s hope we keep it up! That reminds me, I must get a team photo!